Design Discussion Requests

1194 – 10421141 – 10911090 – 10411040 – 1003183 – 141140 – 9190 – 4140 – 1

DR Description Status Date Jurisdiction
DR 1230 Amendments to PSO Process(Read More..) Approved 22/02/2023 RoI Specifc
DR 1227 3Phase Meter MCC01 Exchanges(Read More..) Approved 30/11/2022 RoI Specifc
DR 1226 MCC03 Meter Exchanges(Read More..) Approved 30/11/2022 RoI Specifc
DR 1225 MCC02 Meter Exchanges(Read More..) Approved 14/12/2022 RoI Specifc
DR 1224 Electricity Costs Benefits Scheme 2(Read More..) Approved 26/10/2022 RoI Specifc
DR 1223 Peak ToU for DG7 to DG9(Read More..) Approved 28/09/2022 RoI Specifc
DR 1222 CTF Algorithm(Read More..) Approved 13/04/2022 RoI Specifc
DR 1221 Contingency Process for failure in SPAYG(Read More..) Approved 13/04/2022 RoI Specifc
DR 1220 Electricity Costs Emergency Benefits Scheme(Read More..) Approved 10/03/2022 RoI Specifc
DR 1219 SPAYG – System Process Changed necessary to deliver policy(Read More..) Approved 30/03/2022 RoI Specifc
DR 1216 Smart Metering Remote Operations(Read More..) Approved 30/03/2022 RoI Specifc
DR 1215 MCC02 Smart Meter Exchanges(Read More..) Approved 30/03/2022 RoI Specifc
DR 1214 Interim Metering Responsibilities for Battery Storage(Read More..) Approved 25/08/2021 RoI Specifc
DR 1213 Interim Retail Market Microgen Solution(Read More..) Approved 02/02/2022 RoI Specifc
DR 1212 Cooling off period for MCC changes(Read More..) Withdrawn 23/06/2021 RoI Specifc
DR 1211 Bluetooth Keypad Freedom Unit -Technical(Read More..) Approved 04/11/2020 NI Specifc
DR 1210 Test Webservice(Read More..) Approved 31/03/2021 RoI Specifc
DR 1209 Annual Consumption for HH Sites(Read More..) Approved 03/02/2021 RoI Specifc
DR 1208 Smart Metering Default Data(Read More..) Approved 30/09/2020 RoI Specifc
DR 1207 Cessation of E7 Radio Teleswitching Signal(Read More..) Approved 24/06/2020 RoI Specifc
DR 1206 Covid19 Supply Suspension Process (Read More..) Approved 24/04/2020 RoI Specifc
DR 1205 Application of the PSO to Commercial Storage (Read More..) Approved 04/03/2020 RoI Specifc
DR 1204 DR1204 – Bluetooth Keypad Meter Freedom Unit (Read More..) Approved 04/03/2020 NI Specifc
DR 1203 Micro Generation Deemed Profile Value (Read More..) Approved 16/01/2020 NI Specifc
DR 1202 Micro Generation Sites Process (Read More..) Approved 06/11/2019 NI Specifc
DR 1201 Change Process for 010 CoS when CoT/CoLE flag is set to False (Read More..) Approved 13/09/2019 NI Specifc
DR 1197 Keypad Meters for Micro Business (Read More..) Approved 13/09/2019 Co-ordinated
DR 1194 Adjust NI Readings (Read More..) Approved 27/06/2018 NI Specific
DR 1193 Tibo Recon file (Read More..) Approved 29/08/2018 Co-ordinated
DR 1192 NI Cooling Off (Read More..) Approved 27/06/2018 NI Specific
DR 1191 SolR Review (Read More..) Approved 24/06/2020 ROI Specific
DR 1190 Procedure for Supplier initiated transfers of MPRNs from one Supplier ID to another(Read More..) Approved 27/06/2018 ROI Specific
DR 1189 Additional code in the 017MM to select a de-energisation with Service Removal(Read More..) Approved 13/11/2018 Co-Ordinated
DR 1188 Update of MPD09 to reflect Market Process in relation to Meter/Service removal(Read More..) Approved 30/08/2017 ROI Specific
DR 1187 Introduce Eircodes using the A2 correspondence address(Read More..) Approved 03/05/2017 ROI Specific
DR 1186 Micro Generation(Read More..) Approved 03/05/2017 NI Specific
DR 1185 Small Supplier Categorisation(Read More..) Approved 02/11/2016 ROI Specific
DR 1184 Cooling off for Cos (Read More..) Approved 27/06/2018 ROI Specific
DR 1183 010 Customer Agreement Validation(Read More..) Approved 31/08/2016 Co-ordinated
DR 1182 Impact of I-SEM on the Retail Market in Ireland(Read More..) Approved 31/08/2016 ROI Specific
DR 1181 Technical Contact Details (Read More..) Approved 05/04/2017 ROI Specific
DR 1180 New Registrations Default Supplier (Read More..) Approved 30/08/2017 ROI Specific
DR 1179 Cessation of Eligible Customer Files on ESBN Extranet (Read More..) Approved 04/05/2016 ROI Specific
DR 1178 Change of Customer Details(Read More..) Approved 04/05/2016 NI Specific
DR 1176 Extranet Message Ordering(Read More..) Approved 04/05/2016 ROI Specific
DR 1175 MP Business Ref for Reading(Read More..) Approved 09/03/2016 ROI Specific
DR 1173 Vulnerable Customer Implementation in ROI of SI 463(Read More..) Approved 04/05/2016 Co-ordinated
DR 1169 Addition of Postal Codes to two downloadable Meter Point Details Files (Read More..) Approved 02/09/2015 ROI Specific
DR 1168 Market Messages for Config Changes (Read More..) Approved 02/09/2015 Co-ordinated
DR 1167 Facilitate energy efficiencies in Local Authority Public Lighting(Read More..) Approved 04/11/2015 Co-ordinated
DR 1166 Export Only Supplier (Read More..) Approved 13/05/2015 ROI Specific
DR 1165 Market Design Process Diagrams – conversion from Aris to document format   (Read More..) Approved 13/05/2015 ROI Specific
DR 1161 Smart Metering New Connections (Read More…) Approved 20/03/2019 ROI Specific
DR 1160 Smart Metering Meter Works (Read More…) Approved 24/06/2015 ROI Specific
DR 1159 Smart Metering Change of Supplier (Read More…) Approved 24/06/2015 ROI Specific
DR 1158 Smart Metering Customer Data Changes (Read More…) Approved 24/06/2015 ROI Specific
DR 1157 Smart Metering Data Processing and Data Aggregation   (Read More…) Approved 24/06/2015 ROI Specific
DR 1156 Cancellation Reason Code OS on 111A MM (Read More…) Approved 14/01/2015 ROI Specific
DR 1155 Market Design Process Diagrams – conversion from Aris to document format II   (Read More..) Approved 14/01/2015 ROI Specific
DR 1154 New Unmetered Tariffs for NI.(Read More..) Approved 08/07/2015 Co-ordinated
DR 1152 Change to MG NI 22 – Customer Data Requests- 1/2 Hourly Customer Data requests.(Read More..) Approved 10/09/2014 NI Specific
DR 1151 Add the Meter Multiplier and Meter Category code value for each relevant MPRN to the COM_REG and DOM_REG files available on the Secure File Transfer System (SFTS) (Read More..) Approved 10/09/2014 ROI Specific
DR 1150 Change the method of providing DUoS Billing Information from posted CD to the Secure File Transfer System (SFTS) (Read More..) Approved 28/05/2014 ROI Specific
DR 1149 Request that Suppliers ensure that they submit only one active COLE 016MM for an MPRN (Read More..) Approved 05/11/2014 ROI Specific
DR 1148 An introduction of a 13 month limit for NIE (Read More..) Approved 26/03/2014 NI Specific
DR 1147 Changes to the Market Registration Code Approved Approved of Release Date 21-May 2012 (Read More..) Approved 26/03/2014 NI Specific
DR 1145 Market Design Process Diagrams – conversion from Aris to document format  (Read More..) Approved 26/03/2014 ROI Specific
DR 1144 Changes to SoLR Arrangement in Northern Ireland (Read More..) Approved 29/01/2014 NI Specific
DR 1143 Changes to Export Meter Reading and Wholesale Settlement related to Microgeneration Growth (Read More..) Approved 29/01/2014 NI Specific
DR 1142 DR 1142 – Send 131X Market Message with C010 to the Supplier when 017 MM D02 (De-energise – NPA related) scheduled/despatched fieldwork has been cancelled by NIE at Supplier’s Request” (Read More..) Approved 29/01/2014 NI Specific
DR 1141 Supplier ID Validation on 260MM (Read More..) Approved 04/12/2013 Both (Non Schema)
DR 1140 Intoduction of Eircodes into the Retail Market in Ireland (Read More..) Approved 08/07/2015 RoI Specific
DR 1139 Remove SIC Codes (Standard Industry Classification) from the Schema (Read More..) Approved 16/10/2013 Co-Ordinated
DR 1138 Revised Process for handling Vacant Properties (Read More..) Approved 16/10/2013 NI Specific
DR 1137 Downloadable Meter Points file to only show Billable Meters (Read More..) Approved 16/10/2013 ROI Specific
DR 1136 131 MM to be added to Messages Tab on Extranet (Read More..) Approved 16/10/2013 ROI Specific
DR 1135 Market Webservice as opposed to a Market Website to provide On-Demand Customer Information (Read More..) Approved 12/06/2013 ROI Specific
DR 1134 Post-Harmonisation Sundry ROI non-Schema Design Documentation changes (Read More..) Approved 14/08/2013 ROI Specific
DR 1133 Working Practice for Grouped Unmetered Debt Flagging (Read More..) Approved 12/06/2013 ROI Specific
DR 1132 To Update the NI Baseline Retail Market Documentation (Read More..) Classified 10/04/2013 NI Specific
DR 1131 New Guidelines Document for CoS Erroneous Transfer Process (Read More..) Classified 13/02/2013 NI Specific
DR 1130 Working Practice for De-energisation of Essential Plant Sites (Read More..) Approved 19/09/2012 ROI Specific
DR 1129 Post-Harmonisation Sundry non-Schema changes to HBL (Read More..) Approved 12/06/2013 Harmonisation
DR 1128 Review Secure Meters System Charges (Read More..) Classified 19/09/2012 NI Specific
DR 1127 Market Process for the Installation of Import-Export Meters (Read More..) Classified 31/10/2012 NI Specific
DR 1126 Phone Number Categorisations (Read More..) Approved 08/08/2012 Both (Non Schema)
DR 1125 New Meter Point Status Reason Code on 017 (Read More..) Withdrawn 19/09/2012 Harmonisation
DR 1124 Sending of MM116N only where Customer Name is Different on MM010 and MM016 (Read More..) On Hold 19/09/2012 Both (Non Schema)
DR 1123 TCC field Validation on 017 (Read More..) Classified 27/06/2012 NI Specific
DR 1122 Introduction of Essential Plant into the Market Design (Read More..) Approved 08/08/2012 ROI Specific
DR 1120 Change to MPD 33 Cos Single Point Unmetered (Read More..) Approved 05/12/2012 ROI Specific
DR 1119 Adoption of MP NI 501 509 (Read More..) Classified 23/05/2012 NI Specific
DR 1118 Updates to Enduring Solution NI Market Documentation (Read More..) Classified 23/05/2012 NI Specific
DR 1117 MRC Consultation (Read More..) Classified 27/06/2012 NI Specific
DR 1116 Updates to Enduring Solution NI Market Documentation (Read More..) Classified 22/02/2012 NI Specific
DR 1115 Sundry Code Changes (Read More..) Approved 22/02/2012 Harmonisation
DR 1114 Post-Harmonisation Sundry Technical Changes to HBL- Schema (Read More..) Approved 12/06/2013 Harmonisation
DR 1113 Invalid MPRN Rejection on 010 Market Message (Read More..) Classified 11/01/2012 NI Specific
DR 1112 Domestic COS Reading Validation (Interim Solution) (Read More..) Classified 11/01/2012 NI Specific
DR 1110 Updates to ES NI Market Message Implementation Guides and Retail Market Procedures (Read More..) Classified 12/12/2011 NI Specific
DR 1109 Sundry changes for Harmonised Baseline V2.2 (Read More..) Approved 12/12/2011 Harmonisation
DR 1108 Update to description and usage of Delay Reason Code ‘DE01’ on 130D (Read More..) Approved 12/12/2011 Harmonisation
DR 1107 New ‘Connection Card Required’ code on 102P (Read More..) Approved 12/12/2011 Harmonisation
DR 1106 Update to NIE Revenue Protection Process (Read More..) Classified 19/09/2012 NI Specific
DR 1105 Change to MPD36 – Change of Grouped MPRN_No COS (Read More..) Approved 12/12/2011 ROI Specific
DR 1103 Assessment of the benefits of using temperature corrected profiles in the RoI (Read More..) Withdrawn 16/10/2013 Co-Ordinated
DR 1101 Response to 030 MM – fit Check Meter or Heating not Working (Read More..) Classified 21/09/2011 NI Specific
DR 1100 CoS – 210 Market Messages (Read More..) Classified 21/09/2011 NI Specific
DR 1097 New Order Status Code for Supplier Timeout (Read More..) Approved 27/06/2012 Harmonisation
DR 1096 Customer Service Special Needs – expansion of ROI code setto align with NI practice (Read More..) Approved 04/04/2012 Harmonisation
DR 1092 Removal of the non-billable keypad meter totaliser register from the Interim Solution (Read More..) Classified 10/08/2011 NI Specific
DR 1091 Additional DUoS Tariff and MCC Codes (Read More..) Approved 10/08/2011 Harmonisation
DR 1090 Updated Codes for 300 Series Market Messages (Read More..) Approved 10/08/2011 Harmonisation
DR 1089 Removal of 14 day delay in the Interim market systems (Read More..) Classified 10/08/2011 NI Specific
DR 1088 Daily Report for CoS Reads Validation (Read More..) Classified 10/08/2011 NI Specific
DR 1087 131C1 after 260 check meter is fitted (Read More..) Classified 10/08/2011 NI Specific
DR 1086 Working Practice for Debt Flagging based on CER decision CER 11 106 (Read More..) Approved 10/08/2011 ROI Specific
DR 1085 Change to MPD20 – Grouped CoS (Read More..) Approved 22/02/2012 ROI Specific
DR 1084 Change to MPD36 – Change of Grouped MPRN (Read More..) Approved 02/11/2011 ROI Specific
DR 1083 New Guidelines Document for CoS Erroneous Transfer process (Read More..) Approved 10/08/2011 ROI Specific
DR 1082 New “Chargeable Service Capacity 5 Year Agreement End Date” field on 301 market message (Read More..) Approved 29/06/2011 Harmonisation
DR 1081 Harmonised Data Items Work Type and Unmetered Type (Read More..) Approved 29/06/2011 Harmonisation
DR 1080 New Meter Operation Mode field on 301 301N 320 332 320W and 332W Market Messages (Read More..) Withdrawn 29/06/2011 Harmonisation
DR 1079 Harmonisation Baseline Core Elements for HBL V2.1 (Read More..) Approved 10/08/2011 Harmonisation
DR 1078 Billing of Multiple Reads (Read More..) Classified 15/06/2011 NI Specific
DR 1077 NI Enduring Solution – sundry updates (Read More..) Approved 29/06/2011 Harmonisation
DR 1075 Suppression of 106D and 106E after meter removal or installation (Read More..) Classified 15/06/2011 NI Specific
DR 1074 NI Interim Solution Market Documentation Update (Read More..) Classified 18/05/2011 NI Specific
DR 1073 Supplier Advice of Long Term Vacant Property (Read More..) Approved 18/05/2011 Harmonisation
DR 1072 Updated Codes for 210 and 300 Series Market Messages (Read More..) Classified 18/05/2011 NI Specific
DR 1071 Updated Codes for 210 and 300 Series Market Messages (Read More..) Classified 18/05/2011 NI Specific
DR 1070 New Data Codes (Read More..) Approved 18/05/2011 Harmonisation
DR 1069 Change of Connection Characteristics – Removal of need for 030 Market Message where MCC and associated MIC change required (Read More..) Classified 18/05/2011 NI Specific
DR 1068 New MESN Code (Read More..) Approved 18/05/2011 Harmonisation
DR 1067 Additional fields required on NI Market Website (Interim solution and ES) (Read More..) Classified 18/05/2011 NI Specific
DR 1066 Update of SIC – EAI Codes (Read More..) Approved 18/05/2011 Harmonisation
DR 1065 Removal of Implied Change of Usage from 030 (Read More..) Classified 06/04/2011 NI Specific
DR 1064 Interim Manual Market Process for Pre-payment Meters (Read More..) Approved 06/04/2011 ROI Specific
DR 1063 EUF calculation for Re-energised sites (Read More..) Classified 06/04/2011 NI Specific
DR 1062 Removal of DUoS Tariff – T051 (Read More..) Approved 13/04/2011 Harmonisation
DR 1061 De-energisation Requests by Old Suppliers during a CoS (Read More..) Classified 06/04/2011 NI Specific
DR 1060 Removal of Fieldwork Notice Periods (Read More..) Classified 06/04/2011 NI Specific
DR 1059 Removal of Implied Energisation from 030 (Read More..) Classified 06/04/2011 NI Specific
DR 1058 Meter Works Type Code, Access Arrangements – CoS (Read More..) Approved 06/04/2011 Harmonisation
DR 1057 Removal of Usage Type on 010 (Read More..) Approved 06/04/2011 Harmonisation
DR 1056 Removal of Fields from NI Market Website (Read More..) Classified 06/04/2011 NI Specific
DR 1055 New Register Types, Time of Use Codes and MCC Codes (Read More..) Approved 13/04/2011 Harmonisation
DR 1054 Removal of Supplier Certification (Read More..) Approved 06/04/2011 Harmonisation
DR 1053 Fieldwork Cancellation on CoS (Read More..) Approved 06/04/2011 Harmonisation
DR 1052 Removal of Old Keypad Premises Number from Market Messages (Read More..) Approved 06/04/2011 Harmonisation
DR 1051 New 017 Meter Point Status Reason – Re-energise (Rewire) (Read More..) Approved 06/04/2011 Harmonisation
DR 1050 COS Read Mix-Ups (Read More..) Withdrawn 18/05/2011 Harmonisation
DR 1049 Uploading End of Month N300 Estimates to Secure FTP Server (Read More..) Classified 04/03/2011 NI Specific
DR 1048 Update of NI Schema for Supplier IDs (Read More..) Classified 04/03/2011 NI Specific
DR 1046 Revision of ROI Market Assurance Documentation (Read More..) Approved 23/02/2011 ROI Specific
DR 1045 Removal of non-visit keypad meter configuration changes – NI Interim Solution (Read More..) Classified 23/02/2011 NI Specific
DR 1044 Removal of Cooling off Period (Read More..) Approved 16/12/2010 Harmonisation
DR 1042 Removal of non-visit keypad meter configuration changes (Read More..) Approved 23/02/2011 Harmonisation
DR 1041 Registration Cancellation Timescale (Read More..) Approved 18/11/2010 Harmonisation
DR 1040 New Value in 591 message for Unmetered Total Usage Factor (Read More..) Approved 18/11/2010 Harmonisation
DR 1038 Supplier Advice of Long-Term Vacant Property (Read More..) Approved 18/11/2010 Harmonisation
DR 1036 Use of Customer Number when searching MPRN website for First Domestic CoS (Read More..) Classified 26/10/2010 NI Specific
DR 1035 Use of Free Text Field on N131C Market Message (Read More..) Classified 26/10/2010 NI Specific
DR 1034 Change of Use to Non-Domestic – No Meter Changes Required (Read More..) Classified 26/10/2010 NI Specific
DR 1032 Alignment of Meter Configuration Codes (Read More..) Approved 26/10/2010 Harmonisation
DR 1031 Change to COS Registration for Keypad (Read More..) Approved 23/12/2010 Harmonisation
DR 1030 Read Single Rate Keypad Meters (Read More..) Approved 15/12/2010 Harmonisation
DR 1029 Change of Supplier Appointment Booking (Read More..) Withdrawn 01/12/2010 Harmonisation
DR 1028 Submission of multiple Customer Service Codes on 010, 013, 016 and 017 MMs (Read More..) Approved 01/12/2010 Harmonisation
DR 1024 Global Aggregation (Read More..) Approved 12/10/2010 Harmonisation
DR 1023 Estimated Readings for Change of Legal Entity (Read More..) Approved 12/10/2010 Harmonisation
DR 1022 Removal of EAC/AAC effective from dates from Data Aggregation Audit Logs (Read More..) Approved 12/10/2010 Harmonisation
DR 1018 To Allow Supplier Provided Readings received after 12 months to be validated in the same way as any other reading (Read More..) Approved 12/10/2010 Harmonisation
DR 1017 Change Keypad Meter Configuration – Supplier Execution to be Market Message driven (030 & 210) (Read More..) Approved 12/10/2010 Harmonisation
DR 1016 Use market message for Ungrouped unmetered MPRNs only. Grouped Unmetered MPRN and associated technical unmetered MPRNs to be processed manually. (Read More..) Approved 12/10/2010 Harmonisation
DR 1015 Remove field name “PostCodeMPA” on relevant market messages and revert back to the original field name “PostCode” (Read More..) Approved 12/10/2010 Harmonisation
DR 1014 Change the format of the DUoS and Transactional Supplier Invoices and MPRN level details (Read More..) Approved 12/10/2010 Harmonisation
DR 1013 Removal of Aggregating to Tariff and Meter Configuration Code Level (Read More..) Approved 12/10/2010 Harmonisation
DR 1012 Removal of 303R Market Message for Implausible Reads. Only use 303R Market Message to Reject Invalid Metering Read Details on Supplier Provided Reads (Read More..) Approved 12/10/2010 Harmonisation
DR 1011 Use 507 and 507C Market Message for Designated Disputes in DUoS Billing with 5% Invoice Value Rule Retained (Read More..) Approved 12/10/2010 Harmonisation
DR 1010 Hold Change of Supplier requests until Old Supplier fieldwork has been completed or cancelled (Read More..) Approved 12/10/2010 Harmonisation
DR 1009 Removal of Cleansed Address Indicator (Read More..) Approved 12/10/2010 Harmonisation
DR 1006 Retain MPRN on change of voltage from LV to HV (Read More..) Approved 12/10/2010 Harmonisation
DR 1004 Supplier to use the MCC on 010 New Connection Registration Market Message as agreed by customer at the New Connection Application stage (Read More..) Approved 12/10/2010 Harmonisation
DR 1003 Addition of New Value Codes (Read More..) Approved 12/10/2010 Harmonisation
DR 0183 Sending of Market Messages 591, 595 & 596 to ESBCS (Read More..) Approved 03/06/2010 Pre-Harmonisation
DR 0181 Adding Market Participant Business Reference to Cole Reads on the 300 Market Message (Read More..) Approved 12/10/2010 Pre-Harmonisation
DR 0180 Sending of additional messages to EirGrid-TSO (Read More..) Approved 23/04/2010 Pre-Harmonisation
DR 0177 Treatment of Supplier Unit excess of Generation over Demand (Read More..) Approved 11/03/2010 Pre-Harmonisation
DR 0176 Harmonisation Impact on RoI (Read More..) Approved 10/08/2011 ROI Specific
DR 0175 WP 18 Document the procedure to be used where a customer has a Budget Controller (Token Meter) installed. (Read More..) Approved 26/10/2010 Pre-Harmonisation
DR 0173 DG4 DUoS Tariff for Local Authority Public Lighting (Read More..) In Progress 01/10/2009 Pre-Harmonisation
DR 0172 Domestic Customer Extract on Extranet (Read More..) Approved 20/08/2009 Pre-Harmonisation
DR 0170 Email Address Validation (Read More..) Approved 07/05/2009 Pre-Harmonisation
DR 0169 New reject reasons for address change rejection (Read More..) Approved 07/05/2009 Pre-Harmonisation
DR 0168 DRAFT ESBN Position Paper on Firefighting Metering (Read More..) Issued 05/03/2009 Pre-Harmonisation
DR 0166 Allow incomplete set of reads for multiple meters to (Read More..) Approved 07/05/2009 Pre-Harmonisation
DR 0165 Sending of 331 when import and export are sent to different suppliers (Read More..) Approved 15/01/2009 Pre-Harmonisation
DR 0164 Self Supplier Definition (Read More..) Issued 30/10/2008 Pre-Harmonisation
DR 0163 Risk-based Market Assurance approach (Read More..) Issued 30/10/2008 Pre-Harmonisation
DR 0162 Small Supplier Threshold (Read More..) Approved 30/10/2008 Pre-Harmonisation
DR 0161 New web service containing MPRN data currently displayed on the MP Extranet (Read More..) Approved 30/10/2008 Pre-Harmonisation
DR 0160 Delivery of 106d message to EirGrid (Read More..) Approved 18/09/2008 Pre-Harmonisation
DR 0159 Addition of 331MM to notify of QH meter removal during QH de-energisation with meter removal process (Read More..) Approved 14/08/2008 Pre-Harmonisation
DR 0158 Addition of Generator Unit ID and Export arrangement ID to Extranet (Read More..) Approved 14/08/2008 Pre-Harmonisation
DR 0157 Addition of Vulnerable Customer data deletion flag on 102 (Read More..) Approved 14/08/2008 Pre-Harmonisation
DR 0156 Recalculation of Consumption Estimates (Read More..) Approved 14/08/2008 Pre-Harmonisation
DR 0155 Including the meter Multiplier on extranet (Read More..) Approved 26/06/2008 Pre-Harmonisation
DR 0154 Increasing the threshold for connection agreements in CoS process (Read More..) Approved 15/05/2008 Pre-Harmonisation
DR 0153 Working Practice 0016 – Document the procedure to be used for like-to-like QH meter replacement (Read More..) Approved 27/02/2008 Pre-Harmonisation
DR 0151 Amending Generator Unit ID and Generation Unit ID (Read More..) Approved 19/10/2007 Pre-Harmonisation
DR 0150 Change of Supplier objection to Debt (Read More..) In Progress 14/09/2007 Pre-Harmonisation
DR 0149 Additional CoS Read Arrangement for Supplier of Last Resort (Read More..) In Progress 27/06/2007 Pre-Harmonisation
DR 0148 Reformatting of the Load Profile data (Read More..) In Progress 17/05/2007 Pre-Harmonisation
DR 0147 Clarification regarding date selection in WP12 (Read More..) Approved 31/05/2007 Pre-Harmonisation
DR 0146 Inclusion of Seconds (SS) in the Date Timestamp Format (Read More..) Approved 31/05/2007 Pre-Harmonisation
DR 0145 Estimation of QH values for Indicative Aggregation (Read More..) Approved 31/05/2007 Pre-Harmonisation
DR 0144 Changes to the Aggregation Briefing Document, MPD 15 and MPD 16 (2_1) for RA 324 Mitigation and PES Trading Sites (Read More..) Approved 31/05/2007 Pre-Harmonisation
DR 0143 Update to the validation rules within MPD 20 – Change of SSAC and/or Supplier Unit (Read More..) Approved 26/04/2007 Pre-Harmonisation
DR 0142 Update to the validation rules within MPD 2 – QH CoS (Read More..) Approved 26/04/2007 Pre-Harmonisation
DR 0141 Update to the xml schema to remove a pattern validation on the GUID field (Read More..) Approved 10/04/2007 Pre-Harmonisation
DR 0140 Removal of redundant data from V6.1 of the xml schema (Read More..) Withdrawn 01/03/2007 Pre-Harmonisation
DR 0139 Additional Reject Reason Codes to be included with SEM schema changes (Read More..) Approved 26/07/2007 Pre-Harmonisation
DR 0137 Clarifications regarding only sending data in the 591 MM for valid combinations of DLF and Load Profile (Read More..) Approved 28/03/2007 Pre-Harmonisation
DR 0136 Update to the Reading Data Status Definition (Read More..) Approved 15/03/2007 Pre-Harmonisation
DR 0135 Update to WP 0014 Distribution Connected Non Participant Generator Export Arrangements Working Practice. V6.0 (Read More..) Approved 15/03/2007 Pre-Harmonisation
DR 0134 Updates to the 595 market message to satisfy updated requirements relating to Supplier validation of Data Aggregation results (Read More..) Approved 15/03/2007 Pre-Harmonisation
DR 0133 The description of Reject Reason Code ‘SSS’ to be changed from ‘SSAC invalid for the Supplier’ to ‘SSAC invalid for the Supplier Unit’ (Read More..) Approved 15/03/2007 Pre-Harmonisation
DR 0132 Further updates to the Aggregation Briefing Document to satisfy new requirements of SEM implementation (Read More..) Approved 15/03/2007 Pre-Harmonisation
DR 0131 Updates to Meter Point Registration Rejection Market Messages for alignment of Wholesale and Retail Market Registrations for Trading site (Read More..) Approved 15/03/2007 Pre-Harmonisation
DR 0130 Update to MPD 16 (2.1):Data Aggregation and the Aggregation Briefing Document to satisfy new requirements for SEM Implementation (Read More..) Approved 15/03/2007 Pre-Harmonisation
DR 0129 Data changes to accommodate new unmetered lamp types (Read More..) Approved 10/04/2007 Pre-Harmonisation
DR 0128 Increase in tolerance levels for NQH Meter (Read More..) Approved 17/01/2008 Pre-Harmonisation
DR 0127 Corrections to ARIS Market Message Structures (Read More..) Approved 27/09/2007 Pre-Harmonisation
DR 0126 Enhancements to the guidance information in the ARIS Data Definitions (Read More..) In Progress 15/11/2007 Pre-Harmonisation
DR 0125 Meter Details on 341 Market Message (Read More..) Issued 14/12/2006 Pre-Harmonisation
DR 0124 Working Practice 0013 Document the procedure to be used to terminate Meter Point Reference Numbers identified as duplicates (Read More..) Approved 17/01/2008 Pre-Harmonisation
DR 0123 Versioning of 341 messages (Read More..) Approved 23/08/2007 Pre-Harmonisation
DR 0122 Decouple Connection Agreement requirement from Change of Supplier where MIC >= 100kVA and there is no Change of Legal Entity (Read More..) Approved 31/01/2007 Pre-Harmonisation
DR 0121 Extra validation for correct meter point status required at creation of some messages (Read More..) Approved 31/05/2006 Pre-Harmonisation
DR 0120 Rejection of change of usage requests DG5 to 1 or 2 where MIC is greater than or equal to 30 kVA (Read More..) Approved 28/06/2006 Pre-Harmonisation
DR 0119 ADD VALIDATION TO USE OF REGISTERED COMPANY NUMBER-2 PHASE APPROACH (Read More..) In Progress 13/07/2007 Pre-Harmonisation
DR 0118 Avoidance of Erroneous De-registrations – proposed Market Design change (Read More..) In Progress 01/02/2007 Pre-Harmonisation
DR 0117 Proposal to add Acceptance / Completion / Cancellation message to Meter Works Design (Read More..) Approved 30/10/2008 Pre-Harmonisation
DR 0116 Exchanged Meter Ref amendment to provide only for like for like exchanges (Read More..) Approved 10/08/2006 Pre-Harmonisation
DR 0114 Market Message 210 Supplier Provided Reading (Read More..) Issued 10/08/2006 Pre-Harmonisation
DR 0113 SUPPLIER OF LAST RESORT (SOLR) (Read More..) Approved 17/01/2008 Pre-Harmonisation
DR 0112 Market Process for New Transmission Connected site-Import Sites (Read More..) In Progress 19/07/2007 Pre-Harmonisation
DR 0111 Minor Amendments to MPD 14 (Read More..) Approved 04/04/2006 Pre-Harmonisation
DR 0110 Request that section 10 Data Format & Character Set in the MPCC Technical Manual be brought in line with the character set in the schema (Read More..) Approved 04/05/2006 Pre-Harmonisation
DR 0109 Addition of Meter Category Document to market baseline (Read More..) Withdrawn 30/03/2006 Pre-Harmonisation
DR 0108 Business rules for estimation/substitution of QH meter data to be added to MPD 15 (Read More..) Approved 12/04/2006 Pre-Harmonisation
DR 0107 Proposal to modify the Readings Processor to allow it to handle export date (Read More..) Approved 08/03/2006 Pre-Harmonisation
DR 0106 Proposal to change Suppliers Extranet so that it shows only billable devices and add Meter Multiplier field (Read More..) Approved 08/03/2006 Pre-Harmonisation
DR 0105 Remove Meter Point Status Field from 017 Message (Read More..) Approved 08/03/2006 Pre-Harmonisation
DR 0104 Proposed Solution to Actual CoLE reads being replaced by estimates where poor read history (Read More..) Approved 08/03/2006 Pre-Harmonisation
DR 0103 Vulnerable Customer requirements v7.0 (Read More..) Approved 20/06/2007 31/05/2007 11/04/20 Pre-Harmonisation
DR 0102 Validation Rules – to prevent erroneous de-registration (Read More..) Closed 23/01/2006 Pre-Harmonisation
DR 0101 Remove the drop down list from the Generator Unit ID field in the webforms (Read More..) Approved 02/02/2006 Pre-Harmonisation
DR 0100 Addition of codes to replace IID (Read More..) On Hold 05/01/2006 Pre-Harmonisation
DR 0099 Add Effective date of previous CoS to 102R (Read More..) Approved 02/02/2006 Pre-Harmonisation
DR 0098 Provision of Eligible Customer List (Read More..) Approved 24/03/2006 Pre-Harmonisation
DR 0097 Amendment to 501S (Read More..) Approved 09/03/2006 Pre-Harmonisation
DR 0096 New MPD 36 Change of GMPRN (Read More..) Approved 05/01/2006 Pre-Harmonisation
DR 0095 Add Validation to use of Registered Company Number (Read More..) Approved 02/02/2006 Pre-Harmonisation
DR 0094 Proposal to Make First Name Mandatory on Market Messages (Read More..) Approved 05/01/2006 Pre-Harmonisation
DR 0093 kVArh Estimation (Read More..) Closed 30/11/2005 Pre-Harmonisation
DR 0092 Proposed Minor Changes to MPD 15 (Read More..) Approved 05/01/2006 Pre-Harmonisation
DR 0091 New MPD 35 Change of Metering From NQH to QH (Read More..) Approved 01/12/2005 Pre-Harmonisation
DR 0090 Modification to MPDs -Management of QH Eligibility (Read More..) Approved 01/12/2005 Pre-Harmonisation
DR 0088 Addition of Irish language Characters to Character Set (Read More..) Approved 01/12/2005 Pre-Harmonisation
DR 0087 Amendments to Market Gateway Functionality (Read More..) Approved 13/10/2005 Pre-Harmonisation
DR 0086 Provision of Generator Messages to Supplier MPCC (Read More..) Approved 13/10/2005 Pre-Harmonisation
DR 0085 Proposed Revision to Non NPA Re-Energisation/De-Energisation Requests (Read More..) Closed 17/08/2005 Pre-Harmonisation
DR 0084 Demolished Premises Supplier to Send De-Energisation Request New Procedure (Read More..) Closed 17/08/2005 Pre-Harmonisation
DR 0083 New Customer Letters Proposed in Vacant Premises and no Access Scenarios (Read More..) Closed 16/08/2005 Pre-Harmonisation
DR 0082 Addition of Effective from date to 114 message (Read More..) Approved 08/08/2005 Pre-Harmonisation
DR 0081 Amendment to presentation of data on message 501s (Read More..) Withdrawn 22/07/2005 Pre-Harmonisation
DR 0080 Update MPD 29 to cater for SoLR Process for Grouped Unmetered (Read More..) On Hold 01/06/2005 Pre-Harmonisation
DR 0079 Provide a New Market Message to TSO_SSA, with Customer Details, on Change from NQH to QH. (Read More..) Approved 08/08/2005 Pre-Harmonisation
DR 0078 Amendment to 105 required date when 102P received (Read More..) On Hold 18/05/2005 Pre-Harmonisation
DR 0077 Transaction Charge to be invoiced only after the job completion market message sent (Read More..) On Hold 13/05/2005 Pre-Harmonisation
DR 0076 Add register type to the MPRN publication site (Read More..) Approved 07/06/2005 Pre-Harmonisation
DR 0075 Replace data code IID with more specific codes (Read More..) Withdrawn 13/05/2005 Pre-Harmonisation
DR 0074 Amendment to market message 208 to allow it to be sent by suppliers to dispute MRSO Readings (Read More..) Withdrawn 13/05/2005 Pre-Harmonisation
DR 0073 New rule for MPD1 NQH Change of Supplier (Read More..) Approved 08/08/2005 Pre-Harmonisation
DR 0072 Amendments to market messages 501, 501S, 505 and 505S (Read More..) Approved 08/08/2005 Pre-Harmonisation
DR 0071 Addition of field with associated codes to messages 331 & 332 (Read More..) On Hold 13/05/2004 Pre-Harmonisation
DR 0070 Sending readings for de-energised sites (Read More..) On Hold 18/04/2005 Pre-Harmonisation
DR 0069 Amendments to character set (Read More..) Withdrawn 20/04/2005 Pre-Harmonisation
DR 0068 Add Customer Name to Extranet (Read More..) Approved 05/05/2005 Pre-Harmonisation
DR 0067 Add functionality to Extranet to display Group, Technical & Single point Unmetered Connections (Read More..) Approved 21/04/2005 Pre-Harmonisation
DR 0066 Addition of new Code ‘CoG’ Change of Group MPRN (Read More..) Approved 05/05/2005 Pre-Harmonisation
DR 0065 Enhance Market Message validation to reject if MM received for Group Unmetered sites – GMPRNs or TMPRNs (Read More..) Approved 21/04/2005 Pre-Harmonisation
DR 0064 Amendments to de-registration process (Read More..) Approved 21/04/2005 Pre-Harmonisation
DR 0063 Package messages on MPCC (Read More..) Approved 21/04/2005 Pre-Harmonisation
DR 0062 Read Date from Multifunction Meters (Read More..) Approved 21/04/2005 Pre-Harmonisation
DR 0061 Amendments to readings processing in CoS Loss scenario (Read More..) Approved 21/04/2005 Pre-Harmonisation
DR 0060 Modifications to MPCC Access database (Read More..) Approved 28/07/2005 Pre-Harmonisation
DR 0059 Modify MPCC to allow multiple Supplier IDs per Market Participant (Read More..) Approved 04/03/2005 Pre-Harmonisation
DR 0058 Provide report within Webforms to retrieve data on status of messages from the MS access db (Read More..) Approved 10/03/2005 Pre-Harmonisation
DR 0057 Customer Special Needs (Read More..) On Hold 28/09/2004 Pre-Harmonisation
DR 0056 New Market Message to send EUF detail at Register Level (Read More..) Approved 05/04/2005 Pre-Harmonisation
DR 0055 Sending readings for de-energised sites (Read More..) Withdrawn 29/07/2004 Pre-Harmonisation
DR 0054 Changes to 114 Message (Read More..) On Hold 05/07/2004 Pre-Harmonisation
DR 0053 Clarifications to MPD 3 (Read More..) Approved 05/07/2004 Pre-Harmonisation
DR 0052 Change to DUoS Detailed Flat file (Read More..) On Hold 15/06/2004 Pre-Harmonisation
DR 0051 Changes to MPD 12 – Meter problems and damage (Read More..) Approved 21/06/2004 Pre-Harmonisation
DR 0050 Minor changes to message contents arising from testing (Read More..) Approved 05/07/2004 Pre-Harmonisation
DR 0049 Sending readings for de-energised sites (Read More..) Withdrawn 10/06/2004 Pre-Harmonisation
DR 0048 Remove Chargeable from read type on 252 message (Read More..) Withdrawn 09/06/2004 Pre-Harmonisation
DR 0047 Optionality of Settlement Date on Data Aggregation Messages (Read More..) Approved 21/04/2005 Pre-Harmonisation
DR 0046 Registration as an implicit request for energisation (Read More..) Approved 28/05/2004 Pre-Harmonisation
DR 0045 NQH Re-energisation (Read More..) Approved 28/05/2004 Pre-Harmonisation
DR 0044 NQH De-energisation (Read More..) Approved 28/05/2004 Pre-Harmonisation
DR 0043 Clarifications to MPDs (Read More..) Approved 04/06/2004 Pre-Harmonisation
DR 0042 Clarifications to MPDs arising from TSO and SSA comments (Read More..) Approved 07/09/2004 Pre-Harmonisation
DR 0041 Change to optionality of Supplier ID on 111 message (Read More..) Approved 04/06/2004 Pre-Harmonisation
DR 0040 Changes to segment levels on 331 and 332 series of messages (Read More..) Approved 04/06/2004 Pre-Harmonisation
DR 0039 Clarify relationship between 013 and 114 messages on MPD 24 – Changes to Customer Details (Read More..) Approved 28/05/2004 Pre-Harmonisation
DR 0038 Inclusion of Irish County Codes (Read More..) Approved 04/06/2004 Pre-Harmonisation
DR 0037 Changes to allowable data codes (Read More..) Approved 04/06/2004 Pre-Harmonisation
DR 0036 Updates to market messages 101 and 101P to include load profile (Read More..) Approved 28/05/2004 Pre-Harmonisation
DR 0035 Update Meter Works related MPDs to reflect manual interaction between Networks & suppliers (Read More..) Approved 18/05/2004 Pre-Harmonisation
DR 0034 Updates to MPDs to remove ambiguity (Read More..) Approved 18/05/2004 Pre-Harmonisation
DR 0033 Updates to Message Implementation guides (Read More..) Approved 04/06/2004 Pre-Harmonisation
DR 0032 Add Load Profile to Market Messages 114 (Read More..) On Hold 04/06/2004 Pre-Harmonisation
DR 0031 Updates to field lengths and code values (Read More..) Approved 18/05/2004 Pre-Harmonisation
DR 0030 Updates to metered MPDs to include single site unmetered (Read More..) Approved 28/05/2004 Pre-Harmonisation
DR 0029 Sending two versions of market message 111 (Read More..) Approved 18/05/2004 Pre-Harmonisation
DR 0028 Sending two versions of market message 105 (Read More..) Approved 18/05/2004 Pre-Harmonisation
DR 0027 Sending customer service and medical equipment special needs on 105 message (Read More..) On Hold 18/05/2004 Pre-Harmonisation
DR 0026 Sundry Changes to Business Data Definitions arising from Discussions with SSA (Read More..) Approved 18/05/2004 Pre-Harmonisation
DR 0025 Additions to Recipient IDs on market messages (Read More..) Approved 18/05/2004 Pre-Harmonisation
DR 0024 Amend messages 501, 501S to provide re-aggregation totals as well as re-aggregation differences on a monthly basis (Read More..) Withdrawn 01/04/2004 Pre-Harmonisation
DR 0023 Add Market Participant Business Reference Number to Messages 260, 261 and 311 (Read More..) Approved 20/04/2004 Pre-Harmonisation
DR 0022 Change Optionality of Fields on Market Messages (Read More..) Approved 20/04/2004 Pre-Harmonisation
DR 0021 Statement of Conditions for populating ‘D’ fields on market messages (Read More..) Approved 20/04/2004 Pre-Harmonisation
DR 0020 Minor Update to Common Data Segments Message Implementation Guide (Read More..) Approved 20/04/2004 Pre-Harmonisation
DR 0019 MP Daily Summary Reconciliation Count Supporting Document Revised List of EAI Codes (Read More..) Approved 18/05/2004 Pre-Harmonisation
DR 0018 Revised List of EAI Codes Supporting Document Revised List of EAI Codes (Read More..) Approved 20/04/2004 Pre-Harmonisation
DR 0017 Allowable Codes for the ‘Title’ field on market messages supporting document – revised list of EAI Codes (Read More..) Approved 20/04/2004 Pre-Harmonisation
DR 0016 New Market Message to Cater for Negative Functional Acknowledgements from Hub (Read More..) Approved 20/04/2004 Pre-Harmonisation
DR 0015 Medium to communicate ‘Message’ 506 (Read More..) On Hold 06/04/2004 Pre-Harmonisation
DR 0014 Refresh Messages (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0013 Validate EAI on 010 Message (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0012 Use of customer read for Change of Supplier (Read More..) On Hold 06/04/2004 Pre-Harmonisation
DR 0011 Appointments Functionality (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0010 Change optionality of Market Participant Business Reference on 331 Message (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0009 Sending Different data on the 111 message to old and new supplier (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0008 Defaulting Business Reference on Web forms (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0007 Defaulting Business Reference on Web forms (Read More..) Closed 11/03/2004 Pre-Harmonisation
DR 0006 Change to field name on 114 message (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0005 Sundry Changes to Ver 4.1 Market Messages (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0004 Changes to Cardinality on Data Aggregation Message (Read More..) Approved 19/03/2004 Pre-Harmonisation
DR 0003 New Codes to be added to Codes Database (Read More..) Approved 19/03/2004 Pre-Harmonisation
DR 0002 Additions to Message 501 – Estimated Aggregated NQH Supplier Consumption – DNGP (Read More..) Approved 06/04/2004 Pre-Harmonisation
DR 0001 Payments & Disputes Process V2.0 (Read More..) Approved 04/03/2004 Pre-Harmonisation