RMDS

Category: Uncategorized


MCR1223 – – Peak ToU for DG7 to DG9

On 29th June 2022 CRU briefed Market Participants regarding a suite of measures they were considering to introduce. One of the measures under consideration was the introduction of a peak tariff between 17:00– 19:00. The new peak Time of Use…

Read More

DR1223 – Peak ToU for DG7 to DG9

On 29th June 2022 CRU briefed Market Participants regarding a suite of measures they were considering to introduce. One of the measures under consideration was the introduction of a peak tariff between 17:00– 19:00. The new peak Time of Use…

Read More

IGG Conference Call – 28.09.2022

EVENT NAME IGG Conference Call DATE 28.09.2022 TIME 15:00 – 16:00 LOCATION N/A DESCRIPTION Regular IGG Conference Call IGG Conference Call Agenda 28.09.2022 v1.0 Re-versioned MCR1213 – Interim Retail Microgen Solution Re-versioned MCR1189 – Additional Code in the 017MM Re-versioned…

Read More

IGG Meeting – 24.08.2022

EVENT NAME IGG DATE 24.08.2022 TIME 10:30 – 12:30 LOCATION Conference Call DESCRIPTION IGG 10:30 – 12:30 Draft IGG Agenda 24.08.2022 v1.0 IGG Actions Carried Forward August 2022 v1.0 MCR1209 – Annual Consumption for HH Sites Gemserv IGG Presentation 24.08.2022…

Read More

IGG Conference Call – 20.07.2022

EVENT NAME IGG Conference Call DATE 20.07.2022 TIME 15:00 – 16:00 LOCATION N/A DESCRIPTION Regular IGG Conference Call IGG Conference Call Agenda 20.07.2022 v1.0 MCR1193 -New 603MM Daily Summary Transaction Details IGG Actions Closed, Carried Forward & New Actions 20th…

Read More

IGG Meeting – 22.06.2022

EVENT NAME IGG DATE 22.06.2022 TIME 10:30 – 12:30 LOCATION Conference Call DESCRIPTION IGG 10:30 – 12:30 Draft IGG Agenda 22.06.2022 v1.0 IGG Actions Carried Forward June 2022 v1.0 Gemserv IGG Presentation 22.06.2022 v1.0 CRU IGG Presentation 22.06.2022 v1.0 MRSO…

Read More

IGG Conference Call – 25.05.2022

EVENT NAME IGG Conference Call DATE 25.05.2022 TIME 15:00 – 16:00 LOCATION N/A DESCRIPTION Regular IGG Conference Call IGG Conference Call Agenda 25.05.2022 v1.0 MCR1189 – Additional Code in 017MM MCR1216 – Smart Metering Remote Operations MCR1219 – SPAYG –…

Read More

MCR1222 – CTF Algorithm

This new CTF Algorithm MCR is deemed to be essential for V14.00.00 delivery. This MCR derives from MCR1219 V1.0and the pre-existing MCR1216 V1.0 document, and specifically deals with the CTF Algorithm for Smart Meters. Click here to read document

Read More

DR1222 – CTF Algorithm

This new CTF Algorithm DR is deemed to be essential for V14.00.00 delivery. This DR derives from DR1219 V1.0 and the pre-existing DR1216 V1.0 document, and specifically deals with the CTF Algorithm for Smart Meters. This DR will be progressed…

Read More

MCR1221 – Contingency process for failure in SPAYG technology chain

This new Contingency Process MCR is deemed to be essential for V14.00.00 delivery. This MCR derives from MCR1219 V1.0 and the pre-existing MCR1216 V1.0 document, and specifically deals with the Contingency Process for failure in the technology chain for Smart…

Read More

DR1221 – Contingency Process for failure in SPAYG technology chain

This new Contingency Process DR is deemed to be essential for V14.00.00 delivery. This DR derives from DR1219 V1.0 and the pre-existing DR1216 V1.0 document, and specifically deals with the Contingency Process for failure in the technology chain for Smart…

Read More

IGG Meeting – 27.04.2022

EVENT NAME IGG DATE 27.04.2022 TIME 10:30 – 12:30 LOCATION Conference Call DESCRIPTION IGG 10:30 – 12:30 Draft IGG Agenda 27.04.2022 v1.0 IGG Actions Carried Forward April 2022 v1.0 Gemserv IGG Presentation 27.04.2022 v1.0 MRSO IGG Presentation 27.04.2022 v1.0 ESBN…

Read More

MCR1219 – SPAGY System and Process changes necessary to deliver policy

  This MCR details changes necessary to deliver on SPAYG policy in addition to those in DR1216 which must be implemented.     Click here to read document

Read More

DR1219 – SPAYG System Process Changes necessary to deliver policy

This DR details changes necessary to deliver on SPAYG policy in addition to those in DR1216 which must be implemented. Click here to read document

Read More

MCR1216 -Smart Metering Remote Operations

  This MCR provides details of the Retail Market Design changes associated with Smart Metering Remote Operations. It details the changes required to the Retail Market Design to enable the utilisation of the Remote Switch functionality of the Smart Meter…

Read More