EVENT NAME IGG Conference Call DATE 01.02.2023 TIME 15:00 – 16:00 LOCATION N/A DESCRIPTION Regular IGG Conference Call IGG Conference Call Agenda 01.02.2023 v1.0
Read More* Outage Type P = Planned U = Unplanned R= Release Events PO= Postponed Outages in Red have not yet taken place. Outages in Black have completed. Previous Years Outages – 2022 2021 2020 2019 *P/U From To Reason…
Read MoreESBN is therefore proposing a Networks Led approach whereby Single Phase MCC02 meters will be exchanged with Smart Meters configured as MCC02, utilising the capabilities of the RM107 Smart Meter. Click here to read document
Read MoreESBN is therefore proposing a Networks Led approach whereby Single Phase MCC02 meters will be exchanged with Smart Meters configured as MCC02, utilising the capabilities of the RM107 Smart Meter. Click here to read document
Read MoreEVENT NAME IGG DATE 11.01.2023 TIME 10:30 – 12:30 LOCATION Conference Call DESCRIPTION IGG 10:30 – 12:30 Draft IGG Agenda 11.01.2023 v1.0 IGG Actions Carried Forward January 2023 v1.0 ESBN IGG Presentation 11.01.2023 v1.0 Version 1 IGG Presentation 11.01.2023 v1.0…
Read MoreThe proposed solution will adhere to the existing MCC01 exchange process that has been previously rolled out, the only meters in scope are Whole Current MCC01 sites with a 3-phase connection. Click here to read document
Read MoreThe proposed solution will adhere to the existing MCC01 exchange process that has been previously rolled out, the only meters in scope are Whole Current MCC01 sites with a 3-phase connection. Click here to read document
Read MoreMCC03 Cohort 1 MPRNs record consumption on the 24-hour meter only. MCR1226 proposes that ESB Networks leads the exchange of these meters with a single smart meter. Click here to read document
Read MoreMCC03 Cohort 1 MPRNs record consumption on the 24-hour meter only. DR1226 proposes that ESB Networks leads the exchange of these meters with a single smart meter. Click here to read document
Read MoreEVENT NAME IGG Conference Call DATE 30.11.2022 TIME 15:00 – 16:00 LOCATION N/A DESCRIPTION Regular IGG Conference Call IGG Conference Call Agenda 30.11.2022 v1.0 CCR018 – New Rm Code RM305 CCR019 – New RM Code RM108 MDR1227 – 3 Phase…
Read MoreThis change request sets out the retail market process for 1. Issuing of MPRN files i.e. a Snapshot by ESBN to individual suppliers for each Effective Date 2. Transfer of funds received by ESBN from the Exchequer to suppliers 3….
Read MoreThis change request sets out the retail market process for 1. Issuing of MPRN files i.e. a Snapshot by ESBN to individual suppliers for each Effective Date 2. Transfer of funds received by ESBN from the Exchequer to suppliers 3….
Read MoreEVENT NAME IGG DATE 02.11.2022 TIME 10:30 – 12:30 LOCATION Conference Call DESCRIPTION IGG 10:30 – 12:30 Draft IGG Agenda 02.11.2022 v1.0 IGG Actions Carried Forward November 2022 v1.0 MCR1219 – SPAYG System Process necessary to deliver policy MCR1216 –…
Read MoreOn 29th June 2022 CRU briefed Market Participants regarding a suite of measures they were considering to introduce. One of the measures under consideration was the introduction of a peak tariff between 17:00– 19:00. The new peak Time of Use…
Read MoreOn 29th June 2022 CRU briefed Market Participants regarding a suite of measures they were considering to introduce. One of the measures under consideration was the introduction of a peak tariff between 17:00– 19:00. The new peak Time of Use…
Read More