Category: MCR ROI Specific approved


MCR1209 -AnnuaL Consumption for HH Sites

The existing industry design provides a value known as “estimated consumption” within the 320MM which issues following the completion of a COS. The value is importantly used to provide an annual estimate consumption for the site which has come onto…

Read More

MCR1184 – Cooling off for CoS

The customers’ right to the cooling off period is detailed in Directive 2011/83/EU, which was transposed into Irish legislations through the Statutory Instrument S.I. No. 484 of 2013. It provides, inter alia, for the right of a customer to change…

Read More

MCR1185 – Small Supplier Categorisation

Currently the structure of the Small Supplier category does not facilitate the business model of a Supplier having a small number of sites but energy usage greater than 10MW power at peak demand. The proposal is to change the current…

Read More

MCR1187 – Solution to Eircodes using the A2 Address

Three Market Change Requests were previously raised and approved to facilitate the introduction of Eircodes into the Retail Market. •MCR1140 -Introduction of Eircodes into the Retail Market •MCR0175 -New Reject Reason for Address Change Rejection •MCR1169 -Addition of Postal Code…

Read More

MCR1181 – Technical Contact Details

Accurate technical contact address and technical contact details are required and would assist ESBN in completing supplier requests and obtaining accurate meter readings.  Customer such as large banks or telecom companies with many distributed sites should provide accurate technical…

Read More

MCR1179-Cessation of Eligible Cust Files on ESBN Extranet

RMDS became aware that Market System redundancy existed in relation to the Eligible Customer Files (ECF) and the Downloadable Meter Point Files (DF). RMDS undertook to analyse the possible redundancy. The objective of the analysis was to compare the two…

Read More

MCR1176 – Extranet Message Ordering

The Retail market participant Extranet contains a function called “Message Monitoring”. This enables Participants to identify all messages per MPRN (only MPRNs registered to the MP searching) per functional area. The process/functional areas are categorised as follows:  Change of…

Read More

MCR1175 – Provide MP Bus Ref for Reading

When a 210 message is sent for customer read, the 300 message that is returned does not always reference the 210. The Suppliers Business Reference is not always included in the message. The 210 process is then left open on…

Read More

MCR 1169 – Addition of Postal Code to two Downloadable Meter Point Details Files

This change request is for the addition, in ROI, of Postal Codes into two Downloadable Meter Point Details Files. Two Downloadable Meter Point Details Files will be amended to include Postal Codes. There are five files in the suite of…

Read More

MCR 1140 – Introduction of Eircodes into the Retail Market in Ireland.

This change request concerns the design for the introduction of Eircodes into the Retail Market in Ireland. Implementation timelines will be separately agreed, as normal. In 2015, Ireland will implement a postcode system called Eircode (see the Eircode Website https://www.eircode.ie)….

Read More

MCR1160 – Smart Metering Meter Works

The CER, working closely with the Department of Communications, Energy and Natural Resources (DCENR), established the National Smart Metering Programme (NSMP) in late 2007. In Phase 1, a trial was carried out in order to assess the costs and benefits…

Read More

MCR1159 – Smart Metering Change of Supplier

The CER, working closely with the Department of Communications, Energy and Natural Resources (DCENR), established the National Smart Metering Programme (NSMP) in late 2007. In Phase 1, a trial was carried out in order to assess the costs and benefits…

Read More

MCR 1158 – Smart Metering Customer Changes

The CER, working closely with the Department of Communications, Energy and Natural Resources (DCENR), established the National Smart Metering Programme (NSMP) in late 2007. In Phase 1, a trial was carried out in order to assess the costs and benefits…

Read More

MCR 1157 – Smart Metering Data Processing and Data Aggregation

The CER, working closely with the Department of Communications, Energy and Natural Resources (DCENR), established the National Smart Metering Programme (NSMP) in late 2007. In Phase 1, a trial was carried out in order to assess the costs and benefits…

Read More

MCR1166 – Export Only Supplier

The Electricity Market has developed significantly since 2005. The development has lead to opportunities in both the wholesale and retail markets. Opportunities within the market have at times necessitated Participants to operate different models within the wholesale and retail markets….

Read More