MCR1209 -AnnuaL Consumption for HH Sites

The existing industry design provides a value known as “estimated consumption” within the 320MM which issues following the completion of a COS. The value is importantly used to provide an annual estimate consumption for the site which has come onto…

Read More

MCR1190 – Procedure for Supplier initiated transfer of MPRNs from one Supplier ID to another

A new Working Practice has been created to set out the steps which a Supplier must complete in circumstances where supplier initiated transfer of MPRNs from one Supplier ID to another is proposed. The Working Practice sets out a four…

Read More

MCR1184 – Cooling off for CoS

The customers’ right to the cooling off period is detailed in Directive 2011/83/EU, which was transposed into Irish legislations through the Statutory Instrument S.I. No. 484 of 2013. It provides, inter alia, for the right of a customer to change…

Read More

MCR 1188 – Update MPD-09 to reflect Meter/Service Removal

Following the briefing on a P1 SAFETY incident, it was identified that market documentation needed to be updated to reflect the as-is process that is currently in place to cater for meter and/or service removal as part of a de-energisation….

Read More

MCR1185 – Small Supplier Categorisation

Currently the structure of the Small Supplier category does not facilitate the business model of a Supplier having a small number of sites but energy usage greater than 10MW power at peak demand. The proposal is to change the current…

Read More

MCR1187 – Solution to Eircodes using the A2 Address

Three Market Change Requests were previously raised and approved to facilitate the introduction of Eircodes into the Retail Market. •MCR1140 -Introduction of Eircodes into the Retail Market •MCR0175 -New Reject Reason for Address Change Rejection •MCR1169 -Addition of Postal Code…

Read More

MCR1181 – Technical Contact Details

Accurate technical contact address and technical contact details are required and would assist ESBN in completing supplier requests and obtaining accurate meter readings.  Customer such as large banks or telecom companies with many distributed sites should provide accurate technical…

Read More

MCR1183 – 010 Cust Validation Agreement

Within the retail market, customer agreements must be in place before a 010MM can be submitted. In addition, a ten working day cooling off period must have been completed prior to the submission of the 010MM. Currently there is no…

Read More

MCR 1182 – Impact of I-SEM on the Retail Market in ROI

CER’s Retail Market team asked ESB Networks in January 2015 to assess the impact of the ISEM on the Retail Market in Ireland. Whilst the SEM is to undergo a radical transformation arising from changes to European legislation designed to…

Read More

MCR1179-Cessation of Eligible Cust Files on ESBN Extranet

RMDS became aware that Market System redundancy existed in relation to the Eligible Customer Files (ECF) and the Downloadable Meter Point Files (DF). RMDS undertook to analyse the possible redundancy. The objective of the analysis was to compare the two…

Read More

MCR1176 – Extranet Message Ordering

The Retail market participant Extranet contains a function called “Message Monitoring”. This enables Participants to identify all messages per MPRN (only MPRNs registered to the MP searching) per functional area. The process/functional areas are categorised as follows:  Change of…

Read More

MCR1173 -Vulnerable Cust Implementation in RoI of SI 463

This Change Request has been raised for changes that are required to implement compliance in RoI with SI 463 Summary of Proposed Changes: Capture mental health & dexterity impaired as a type of vulnerability thus allowing suppliers to register customers…

Read More

MCR1175 – Provide MP Bus Ref for Reading

When a 210 message is sent for customer read, the 300 message that is returned does not always reference the 210. The Suppliers Business Reference is not always included in the message. The 210 process is then left open on…

Read More

MCR1133 – Working Practice for Grouped Unmetered Debt Flagging

In June 2011 the Commission published a proposed Decision, CER/11/106 – Customer Bad Debt in Electricity & Gas Markets, on the issue of Customer Bad Debt. CER approved the implementation of a debt flagging facility into the Change of Supplier…

Read More

MCR1167 – Facilitate energy efficiencies in Local Authority Public Lighting

The CCMA and TII have requested changes in the Unmetered Public Lighting sector in the Electricity Retail Market in RoI to facilitate energy efficiencies in Local Authority Public Lighting. This request has been submitted to ESB Networks from the Local…

Read More