This Discussion Request proposes the removal of the following redundant data from V6.1 of the schema due for release on November 2007: 1. DG4 2. MCC68 Click here to read the document.
Read MoreRequirement for a procedure to be documented where a customer has a Budget Controller (Token Meter) installed. Click here to read the document.
Read MoreThe Market Participant Business Reference is provided in the Message Header of the 016 MM sent by the Supplier to request a CoLE. Currently, this field is not populated on the 300 MM which issues with the CoLE read(s). If…
Read MoreESB Networks HUB functionality/parameters is/are to be amended to facilitate the sending of the following Market Messages to ESB Customer Supply: o 591 – Aggregated NQH Data o 595 – Aggregated QH Data o 596 – Supplier Copy of SMO…
Read MoreEirGrid/TSO require the Central Market Systems to send a copy of the following market message: • 342 (Export QH Meter Daily Readings) This change will be facilitated by a change in the Central Market Systems that control the issuing of…
Read MoreThere is a requirement that the functionality of the Retail Market that sets positive Supplier Units to zero, along with any associated out-of-market registration checks and information messaging, be turned off. This will enable positive values to be displayed in…
Read MoreThere is some badly corroded public lighting equipment mounted on ESB poles which is hindering ESB Networks in carrying out LV refurbishment programmes agreed under the price improvement programmes. Local Authorities do not have the funds to address this issue…
Read MoreIncreasing levels of competition in the electricity market have given rise to demands from suppliers for access to the Meter Point registration database on the Extranet in a downloadable, regularly refreshed format for use in in-house systems and processes. This…
Read MoreCurrently when Market participants submit reads via market message 210, validation is in place within the Central Market System (CMS) which prohibits the acceptance of an actual read as part of an incomplete set of reads for a site with…
Read MoreMPRN/Site Address change requests are sent by suppliers to ESBN via the 013 message. Each site address change is outsorted and reviewed by a member of the Networks Database team. Some change requests involve lengthy investigations before a decision is…
Read MoreThe upgrade of the Central Market System has resulted in the requirement of email validation across the market. The Upgraded Central Market System (SAP ERP6) requires emails to be structured according to the following rules: • A mail address may…
Read MoreThere is an ESB Networks business requirement to determine an approach for handling connections where fire fighting metering is required to be installed. There is a requirement to inform the market where this type of metering is installed as fire…
Read MoreThis DR concerns non participant generator sites where import and export are sent to different suppliers. The issue is that all standard messages (and specifically the 331MM) are sent to the registered supplier who receives import for the generator site,…
Read MoreThis DR was originally designed in 2006. Since the first design, various system changes have taken place – the most significant change being the implementation of the mobile solution. These changes have made it necessary to revisit the original DR…
Read MoreMarket Participants requested the provision of a web service whereby a supplier could send out a procedural call to the ESB Networks MP Extranet website using an MPRN and pull back all of the data fields on the existing MPRN…
Read More