Category: DR Pre-harmonisation


DR 0140 – Removal of redundant data from V6.1 of the xml schema

This Discussion Request proposes the removal of the following redundant data from V6.1 of the schema due for release on November 2007: 1. DG4 2. MCC68 Click here to read the document.

Read More

DR 0175 – WP 18 Document the procedure to be used where a customer has a Budget Controller (Token Meter) installed.

Requirement for a procedure to be documented where a customer has a Budget Controller (Token Meter) installed. Click here to read the document.

Read More

DR 0181 – Adding Market Participant Business Reference to Cole Reads on the 300 Market Message

The Market Participant Business Reference is provided in the Message Header of the 016 MM sent by the Supplier to request a CoLE. Currently, this field is not populated on the 300 MM which issues with the CoLE read(s). If…

Read More

DR 0183 – Sending of Market Messages 591, 595 & 596 to ESBCS

ESB Networks HUB functionality/parameters is/are to be amended to facilitate the sending of the following Market Messages to ESB Customer Supply: o 591 – Aggregated NQH Data o 595 – Aggregated QH Data o 596 – Supplier Copy of SMO…

Read More

DR 0180 – Sending of additional messages to EirGrid-TSO

EirGrid/TSO require the Central Market Systems to send a copy of the following market message: • 342 (Export QH Meter Daily Readings) This change will be facilitated by a change in the Central Market Systems that control the issuing of…

Read More

DR 0177 – Treatment of Supplier Unit excess of Generation over Demand

There is a requirement that the functionality of the Retail Market that sets positive Supplier Units to zero, along with any associated out-of-market registration checks and information messaging, be turned off. This will enable positive values to be displayed in…

Read More

DR 0173 – DG4 DUoS Tariff for Local Authority Public Lighting

There is some badly corroded public lighting equipment mounted on ESB poles which is hindering ESB Networks in carrying out LV refurbishment programmes agreed under the price improvement programmes. Local Authorities do not have the funds to address this issue…

Read More

DR 0172 – Domestic Customer Extract on Extranet

Increasing levels of competition in the electricity market have given rise to demands from suppliers for access to the Meter Point registration database on the Extranet in a downloadable, regularly refreshed format for use in in-house systems and processes. This…

Read More

DR 0166 – Allow incomplete set of reads for multiple meters to

Currently when Market participants submit reads via market message 210, validation is in place within the Central Market System (CMS) which prohibits the acceptance of an actual read as part of an incomplete set of reads for a site with…

Read More

DR 0169 – New reject reasons for address change rejection

MPRN/Site Address change requests are sent by suppliers to ESBN via the 013 message. Each site address change is outsorted and reviewed by a member of the Networks Database team. Some change requests involve lengthy investigations before a decision is…

Read More

DR 0170 – Email Address Validation

The upgrade of the Central Market System has resulted in the requirement of email validation across the market. The Upgraded Central Market System (SAP ERP6) requires emails to be structured according to the following rules: • A mail address may…

Read More

DR 0168 – DRAFT ESBN Position Paper on Firefighting Metering

There is an ESB Networks business requirement to determine an approach for handling connections where fire fighting metering is required to be installed. There is a requirement to inform the market where this type of metering is installed as fire…

Read More

DR 0165 – Sending of 331 when import and export are sent to different suppliers

This DR concerns non participant generator sites where import and export are sent to different suppliers. The issue is that all standard messages (and specifically the 331MM) are sent to the registered supplier who receives import for the generator site,…

Read More

DR 0117 – Proposal to add Acceptance / Completion / Cancellation message to Meter Works Design

This DR was originally designed in 2006. Since the first design, various system changes have taken place – the most significant change being the implementation of the mobile solution. These changes have made it necessary to revisit the original DR…

Read More

DR 0161 – New web service containing MPRN data currently displayed on the MP Extranet

Market Participants requested the provision of a web service whereby a supplier could send out a procedural call to the ESB Networks MP Extranet website using an MPRN and pull back all of the data fields on the existing MPRN…

Read More