MCR 1006 – Retain MPRN on change of voltage from LV to HV

When a change of voltage is required at the customer’s meter NIE terminates the existing Low Voltage (LV) MPRN and assigns a new MPRN for

the High Voltage (HV) connection. This Discussion Request proposes to maintain the same MPRN and change the characteristics.

Click here to open the document.