MCR 0161 – Increasing the threshold for connection agreement return

Background:

DR122

DR 154 is closely linked with the requirement in DR 122 to remove the requirement for a signed connection agreement in the case of a change of supplier with no CoLE. This requirement was required by CER decision made in 2006 CER06143 (see link below).

http://www.cer.ie/CERDocs/cer06143.pdf

Click here to open the document.