RMDS

Monthly Archives: June 2008


MCR 0163 – Increase in tolerance levels for NQH Meter Reading validation

This Discussion Request has been raised to discuss increasing the tolerance levels for NQH meter reading validation Detail: Currently, the NQH Data Collection team manually handle several hundred meter readings a day that have been outsorted, because the indicated register…

Read More

MCR 0162 – Supplier of Last Resort (SoLR)

Background In April 2005 the Commission published a consultation document (CER/05/072) on the role and appointment of a Supplier of Last Resort (SoLR) in the Irish market. Later, in December 2005, the Commission issued a proposed Decision (CER/05/238) on this…

Read More

MCR 0161 – Increasing the threshold for connection agreement return

Background: DR122 DR 154 is closely linked with the requirement in DR 122 to remove the requirement for a signed connection agreement in the case of a change of supplier with no CoLE. This requirement was required by CER decision…

Read More

DR 0155 – Including the meter Multiplier on extranet

It has been proposed to add the meter multiplier to the extranet.  After examination of the data structure it is suggested that the meter multiplier be added to the register level data on the MPRN search page. Click here to read…

Read More
Cookie Settings