 Background:

When a QH meter is replaced, both the MV90 (data polling) system and the Central Market System (SAP IS/U) need to be updated. Since data is polled daily, the market design calls for the Network Technician to advise the new meter details to PDS from the site. On the other hand, updating of the CMS has depended on the paper service order being sent to Database and the data being keyed in.