MCR 0125 – New Distribution Connected Non Participant Generator Export Arrangements Working Practice

The market design for the Single Electricity Market makes provision for Generator sites with an MEC <10MW that do not wish to be participant within the pool market and, in effect, allows them to make arrangements outside the market for the sale of their generation.

This sale is outside the scope of the market design but the mechanism through which it will be reflected will be a netting of this Non Participant Generator Export Data from the Demand that Supplier is registered against. In order to perform the netting, the generation must be attributed to the correct Supplier Unit in advance as per the process shown in MPDs 7 1.1, 7 1.3 and 7 1.5.