The following changes are required to MPD5 New NQH Metered to cater for proposed new

arrangements for QH Eligibility

MPD5 New NQH Metered Connection

All new connections at LV (excluding embedded generators) will be set up as NQH(currently LV new

connections at 200KVA or higher are set up as QH).